Hanover Point

New Build | Luxury Apartments

Type
24m in Height
Pump Quantity
1 SKID Pump
Installation Time
17 Days
Nozzle Quantity
137
Area
Newcastle

Background

iMist™ were contracted to install a system into this brand new luxury apartment block in Newcastle. Hanover Point comprises ten bespoke apartments across eight levels, situated within a gated, landscaped courtyard. Each apartment is unique in design, with its own private outdoor space.

Building control required a fire suppression system due to the building exceeding 11m in height and the open-plan nature of the apartments.

Solution

iMist™ met building control requirements by covering all apartments and duplex apartments. As they were open-plan with inner bedrooms, coverage was required everywhere except the ensuite bathrooms and utility room.

iMist™ will maintain and service the systems yearly to maintain pump warranty and ensure the systems and components are working efficiently.