Llys Faith

Assisted Living - Cardiff

Case Study Description

Llys Faith
TYPE
Assisted Living
COMPLETION TIME
6 Months
AREA
Llanishen, Cardiff
PUMP QUANTITY
4 Residential Pumps
NOZZLES QUANTITY
840+

Background

Wales’ Llys Faith project consisted of 90 x 1-2 bedroom apartments.

Our client originally planned to use a sprinkler company to complete this job. However, they were concerned about the amount of space they would lose to a water storage tank, and the water damage they would be left with in the event of an activation.

Solution

Our client, then took a particular interest in iMist™ because of the minimal amount of water required for our system and were very pleased to learn that the space they would originally lose, would not be required for our system, which allowed the customer the opportunity to provide other in-house services. 

iMist™ installed over 840 nozzles throughout the building, in all habitable rooms taking roughly 6 months to complete the entire installation. 

antalya escort